Basaksehir- Onurkent Subway Project

Basaksehir- Onurkent Subway Project

BAŞAKŞEHİR- ONURKENT METRO HATTI

Start End Date         : 2021-2022
Location                     : Turkey-Istanbul-Basaksehir
Construction Area : 3000 m2
Employer                   : Bayburt Grup A.Ş

Başakşehir-Onurkent Subway Station is an underground metro station located in the M3 (Bakırköy Coast – Kayaşehir Centre) Subway Line of the Istanbul subway, which was put into service on 8 April 2023.The turnstile floor, technical floors and shaft fabrications, tunnel mirrors fabrications, G2 and G3 exit structure rough fabrications of Başakşehir onurkent subway station were completed by Eracar Grup İnş. Tic. Ltd. Şti. has been completed.

Bakirkoy-Incirli Subway Project

Bakirkoy-Incirli Subway Project

BAKIRKÖY – İNCİRLI SUBWAY LINE PROJECT

Start End Date        : 2023-2023
Location                    : Turkey-Istanbul-Bakirkoy
Construction Area : 2000 m2
Employer                   : Bayburt Grup A.Ş

The 9 km long Bablirköy – Bahçelievler – Kirazlı Subway Line connects the districts of Bakırköy, Bahçelievler, Güngören and Bağcılar. Bakırköy – Bahçelievler – Kirazli Subway line serves 70 thousand passengers in one direction per hour and consists of 8 stations. The finalisations of the rough construction of Bakırköy İncirli North Station, which is next to Life plaza shopping mall, and the rough manufacturing of the shaft located in the incirli north station were completed by Eracar Grup İnş. Tic. Ltd. Şti. has been completed.

Bağcılar-Molla Gürani Subway Ventilation Shaft Construction

Bağcılar-Molla Gürani Subway Ventilation Shaft Construction

BAĞCILAR – MOLLA GÜRANI STATION VENTILATION SHAFT CONSTRUCTION WORK

Start End Date        : 2024-Continues
Location                    :Turkey-Istanbul-Bagcilar
Construction Area : 1600 m2
Employer                  : Bayburt Grup A.Ş

CP 01 ventilation shaft is located in the continuation of Molla Gurani Metro Station. The rough construction of the shaft through which the ventilation systems in the tunnel of the underground metro station, which is located in the M3 Metro Line of the Istanbul Metro in Bağcılar and put into service on 10 March 2024, was completed by Eracar Grup İnş. Tic. Ltd. Şti.

Bağcılar Molla Gürhani Subway Project

Bağcılar Molla Gürhani Subway Project

BAĞCILAR – MOLLA GÜRANİ METRO LINE PROJECT

Start End Date      : 2024-Continues
Location                  :Turkey-Istanbul-Bagcilar
Construction Area : 2000 m2
Employer                : Bayburt Grup A.Ş

Molla Gürani Metro Station is an underground metro station on the M3 Metro Line of the Istanbul Metro in Bağcılar, which was put into service on 10 March 2024. The 9 km long BAKIRKÖY – BAHÇELİEVLER – KİRAZLI METRO LINE connects the districts of Bakırköy, Bahçelievler, Güngören and Bağcılar.
The rough construction of 2000 m² area in Bağcılar molla gürani station D block was completed by Eracar Grup İnş. Tic. Ltd. Şti. has been completed.

Bağcılar Molla Gürhani Viaduct

Bağcılar Molla Gürhani Viaduct

BAĞCILAR
MOLLA GÜRANI STATION CLOSED CAR PARK CONSTRUCTION WORK

Start End Date        : 2024-Continues
Location                    :Turkey-Istanbul-Bagcilar
Construction Area : 12000 m2
Employer                   : Bayburt Grup A.Ş

The rough construction of the car park, which will belong to the Molla Gürani metro station, which is located in the M3 Metro Line of the Istanbul Metro in Bağcılar and put into service on 10 March 2024, was completed by Eracar Grup İnş. Tic. Ltd. Şti. is in progress.