Cayirbasi-4 Project

Cayirbasi-4 Project

Cayirbasi-4 Project

Start End Date         : 2024-Continues.
Location                  :Turkey-Istanbul-Sile
Construction Area : 5000 m2
Employer                    : Eracar Group Construction. Tic. Ltd. Şti.

A fairy tale place in Şile, Çayırbaşı region, in the grove, where you can enjoy every season with its social facilities, prioritising privacy.

The project consists of 23 independent villas and 23 detached pools belonging to each villa, walking paths within the site, social facilities, car parks and green areas reserved for each independent section. It is 5 minutes drive from the centre of Şile. The project is planned as detached and twin blocks and different living options are available.

Cayirbasi-5 Project

Cayirbasi-5 Project

Cayirbasi-5 Project

Start End Date         : 2024-Continues.
Location                     :Turkey-Istanbul-Sile
Construction Area : 5000 m2
Employer : Eracar Group Construction. Tic. Ltd. Şti.

A fairy tale place in Şile, Çayırbaşı region, in the grove, where you can enjoy every season with its social facilities, prioritising privacy.

The project consists of 13 independent villas and 13 detached pools belonging to each villa, walking paths within the site, social facilities, car parks and green areas reserved for each independent section. It is 5 minutes drive from the centre of Şile. The project is planned as detached and twin blocks and different living options are available.

Milas Project

Milas Project

Milas Project

Start End Date          : 2024-Continues.
Location                      :Turkey-Muğla-Milas
Construction Area : 1500 m2
Employer                    : Eracar Group Construction. Tic. Ltd. Şti.

Milas is a sanctuary where you can enjoy the sea and nature from every window, overlooking the bird paradise, only 7 minutes from the airport, where you can enjoy the summer.

The project consists of 8 independent villas and 8 detached pools belonging to each villa, walking paths within the site, viewing camellias with sea view, and car parks and green areas reserved for each independent section. It is only 8 minutes from the airport and has a bird paradise view. The project is planned in two types and different living options are available.

Bağcılar-Molla Gürani Subway Ventilation Shaft Construction

Bağcılar-Molla Gürani Subway Ventilation Shaft Construction

Bağcılar-Molla Gürani Subway Ventilation Shaft Construction

 Start End Date          : 2024-Continues
Location                     :Turkey-Istanbul-Bagcilar
Construction Area : 1600 m2
Employer                    : Bayburt Grup A.Ş

CP 01 ventilation shaft is located in the continuation of Molla Gurani Subway Station. The rough construction of the shaft through which the ventilation systems in the tunnel of the underground metro station, which is located in the M3 Subway Line of the Istanbul Subway in Bağcılar and put into service on 10 March 2024, was completed by Eracar Grup İnş. Tic. Ltd. Şti.

Blue Grove Project

Blue Grove Project

Blue Grove Project

Start End Date         : 2023-2024
Location                     : Turkey-Istanbul-Sile
Construction Area : 750 m2
Employer                    : Eracar Group Construction. Tic. Ltd. Şti.

Blue and Green under your feet…

A fairytale place in the Balibey region of Şile, in the centre of Şile, where the sea and nature can be seen from every window, keeping privacy in the foreground.

Balibey project consists of 4 independent duplex apartments, car park and green areas reserved for each independent section. It is located in the central area of Şilenin and is only walking distance to all social facilities, hospital, school, park and beach.

Kavilla Project

Kavilla Project

Kavilla Project

Start End Date        : 2022-2024
Location                    : Turkey-Istanbul-Sile
Construction Area : 4000 m2
Employer                  : Eracar Group Construction. Tic. Ltd. Şti.

Blue and Green under your feet…

A fairy tale place in Şile, karacaköy region, where the sea and nature can be seen from every window, where you can enjoy every season with its social facilities, prioritising privacy.

Kavilla project consists of 19 independent villas and 19 detached pools belonging to each villa, walking paths within the site, deep blue stream and waterfall, viewing camellias with sea view, tennis court and car park and green areas reserved for each independent section. It is also only walking distance to private and public beaches. The project is planned as detached and twin blocks and different living options are available.

Mystery Garden Villas

Mystery Garden Villas

Mystery Garden Villas

Start End Date          : 2021-2022
Location                     : Turkey-Zonguldak-Ereğli
Construction Area : 850 m2
Employer                    : Eracar Group Construction. Tic. Ltd. Şti.

Life Hidden in the Green Cover…

In Şile, Geredeli region, you can enjoy the summer and green living space with a detached concept, focusing on privacy, covered with lush green nature.

Mystery Garden Villas has 6 independent sections and large green areas, communal swimming and children’s pool, car park and social facilities. With its location at a short distance to the favourite holiday areas, it creates living spaces where you can enjoy the summer and relax by hiding in the green.

Devrek-Ereğli Road Supply Construction Works

Devrek-Ereğli Road Supply Construction Works

BAŞAKŞEHİR- KAYAŞEHİR SUBWAY LINE

Start End Date          : 2022-2024
Location                     : Turkey-Zonguldak-Ereğli
Construction Area : KM: 0+000-32+500
Employer                   : Bayburt Grup A.Ş

DEVREK-EREĞLİ ROAD KM: 0+000-32+500, culverts, underpasses, retaining walls and gravity wall Eracar Grup İnş. Tic. Ltd. Şti.

Basaksehir – Kayasehir Subway Line

Basaksehir – Kayasehir Subway Line

Basaksehir – Kayasehir Subway Line

Start End Date          : 2021-2022
Location                     : Turkey-Istanbul-Basaksehir
Construction Area : 3000 m2
Employer                   : Bayburt Grup A.Ş

Başakşehir-Kayaşehir subway line is 6,20 km long and is a continuation of Kirazlı-Başakakşehir-Olimpiyat Metro line. The rough construction of Kayaşehir central station, shaft 7 exit structure, shaft 9 exit structure and exit structures in shaft 9 ventilation shaft in Kayaşehir central station were completed by Eracar Grup İnş. Tic. Ltd. Şti. has been completed.