Bağcılar-Molla Gürani Subway Ventilation Shaft Construction
Start End Date : 2024-Continues
Location :Turkey-Istanbul-Bagcilar
Construction Area : 1600 m2
Employer : Bayburt Grup A.Ş
CP 01 ventilation shaft is located in the continuation of Molla Gurani Subway Station. The rough construction of the shaft through which the ventilation systems in the tunnel of the underground metro station, which is located in the M3 Subway Line of the Istanbul Subway in Bağcılar and put into service on 10 March 2024, was completed by Eracar Grup İnş. Tic. Ltd. Şti.